FOI release

Charging infrastructure relating to electric vehicles

Case reference FOI2024/01261

Received 25 July 2024

Published 1 August 2024

Request

I am writing to request information with regards to the council’s current and future plans for Charging Infrastructure relating to Electric Vehicles, including street cleaning, drain cleaning and waste and recycling collection vehicles at council depots.

1. Can you please confirm if any of your council depots have the following charges in place at present from the below Charger List?

Charger List:

a. AC Charging up to a 22 KW AC charger with Type 2 connection?

b. DC Charging up to 150 kw using a CCS2 Connector?

c. AC Charging using up to 43 KW with Type 2 connection?

d. DC charging up to 250 KW using CCS2 Connector?

e. AC charging using 22 kw charger with Type 2 connection?

f. 3 phase connection using either 32 amp or 63-amp power supply?

g. AC charging using standard Type 2 connection with a 7.5 kw or 22kw power supply?

h. 13-amp socket via an alternative cable

1.i. Please can you provide the number of each you have access to.

2. If not, can you confirm if there are plans in place to have any of these fitted?

2.i. If so which number(s)?

2.ii. If so, do you know when?

Response

I am writing to request information with regards to the council’s current and future plans for Charging Infrastructure relating to Electric Vehicles, including street cleaning, drain cleaning and waste and recycling collection vehicles at council depots.

1. Can you please confirm if any of your council depots have the following charges in place at present from the below Charger List?

Charger List:

a. AC Charging up to a 22 KW AC charger with Type 2 connection?

b. DC Charging up to 150 kw using a CCS2 Connector?

c. AC Charging using up to 43 KW with Type 2 connection?

d. DC charging up to 250 KW using CCS2 Connector?

e. AC charging using 22 kw charger with Type 2 connection?

f. 3 phase connection using either 32 amp or 63-amp power supply?

g. AC charging using standard Type 2 connection with a 7.5 kw or 22kw power supply?

h. 13-amp socket via an alternative cable

A) No to all the above.

1.i. Please can you provide the number of each you have access to.

A) N/A

2. If not, can you confirm if there are plans in place to have any of these fitted?

A) Yes

2.i. If so which number(s)?

A) b. DC Charging up to 150 kw using a CCS2 Connector

e. AC charging using 22 kw charger with Type 2 connection

g. AC charging using standard Type 2 connection with a 7.5 kw or 22kw power supply

2.ii. If so, do you know when?

A) Autumn 2024.

Documents

There are no documents for this release.

This is Herefordshire Council's response to a freedom of information (FOI) or environmental information regulations (EIR) request.

You can browse our other responses or make a new FOI request.