FOI release

Local Authority Utility-Scale Assets

Case reference FOI2025/00560

Received 18 March 2025

Published 27 March 2025

Request

I would be grateful if you can assist my research into Local Authorities who generate and export electricity from their own energy. I am particularly looking at utility-scale assets, e.g. solar farms, wind turbines and waste to energy plants, rather than small-scale, behind-the-meter assets (e.g. rooftop solar installations). I’d be grateful if you could answer the following questions: -

1) Do you own or operate utility-scale electricity generation assets which export to the grid?

2) If so, what technologies? And are they ‘co-located’? E.g., a solar farm with a battery.

3) How much electricity (in kWh) would you expect to be exported, from each asset, per year? And how much revenue would you expect to earn from the export in FY25/26?

4) When was each asset commissioned?

5) What is the current contractual arrangement to sell the power, to whom is it sold and what is the contract end date?

6) Do you partake in any government subsidy scheme in relation to the electrical output from the asset? E.g. Renewables Obligation Certificates (ROC) or Contracts for Difference (CfD).

7) Does your Local Authority have any plans in place to acquire, build or invest in electricity generation assets in the future?

7a.) If Yes , what is the:

- Type of Assets (e.g. Solar)

- Estimated Size of the assets in terms of electricity production

- Estimated dates of completion

- Organisations that are constructing the assets (if known)

Response

I would be grateful if you can assist my research into Local Authorities who generate and export electricity from their own energy. I am particularly looking at utility-scale assets, e.g. solar farms, wind turbines and waste to energy plants, rather than small-scale, behind-the-meter assets (e.g. rooftop solar installations). I’d be grateful if you could answer the following questions: -

1) Do you own or operate utility-scale electricity generation assets which export to the grid?

Answer: No

2) If so, what technologies? And are they ‘co-located’? E.g., a solar farm with a battery.

Answer: N/A

3) How much electricity (in kWh) would you expect to be exported, from each asset, per year? And how much revenue would you expect to earn from the export in FY25/26?

Answer: N/A

4) When was each asset commissioned?

Answer: N/A

5) What is the current contractual arrangement to sell the power, to whom is it sold and what is the contract end date?

Answer: N/A

6) Do you partake in any government subsidy scheme in relation to the electrical output from the asset? E.g. Renewables Obligation Certificates (ROC) or Contracts for Difference (CfD).

Answer: N/A

7) Does your Local Authority have any plans in place to acquire, build or invest in electricity generation assets in the future?

Answer: Yes

7a.) If Yes , what is the:

- Type of Assets (e.g. Solar)

Answer: Solar Car Port

- Estimated Size of the assets in terms of electricity production

Answer: 250kWp – 200,000kWh/yr

- Estimated dates of completion

Answer: 2026

- Organisations that are constructing the assets (if known)

Answer: Unknown

Documents

There are no documents for this release.

This is Herefordshire Council's response to a freedom of information (FOI) or environmental information regulations (EIR) request.